Pre-feasibility Study

Pre-feasibility Study

Pre-feasibility Study of Integrated Waste Management and Landfill Gas Recovery and Utilization at Puducherry

An assessment of the potential for LFG utilization was carried out for a Puducherry landfill. The study was based on information provided by the Puducherry Pollution Control Committee and Puducherry Municipality and observations made during the site visit. The model results indicated that various constraints are likely to limit future LFG recovery to a maximum of 22.8 cubic meters per hour.

Supported by: United States Environmental Protection Agency (USEPA)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Fill The Details

Fill The Details

Fill The Details

Fill The Details

Fill The Details

Fill The Details

Fill The Details

Fill The Details

Fill The Details

Fill The Details

Fill The Details

Fill The Details

Fill The Details